This is the last concrete wall for the under construction Leounes/Laconian Museum completed yesterday.
This wall has two square and three round columns. You can see at the photos the two square but you can not see the three round columns until we remove the forms in about ten days.
This is the front wall people to see walking from the lower level parking lotto the museum and to the theater.
We are making sure the front view of the museum to be impressive dressed with marble art work.
Tomorrow morning complete also the last concrete base for a steel column and after this, in a day with good weather, will finish the concrete floor.
This Saturday and Sunday our plumber Petros Iosifidis will place all underground water and sewer lines.
Together with our Architect Stefanos Nousiopoulos and Structural Engineer Paulos tsakopoulos will make final measurements the steel fabricator needs for the heavy structure which will support an 8,000 SF roof(concrete flat roof).
Best wishes,
Ilias Tomazos